Power Plant Control Logic, D&A 410
This project is done based on a contract with Tavanir Co. Tehran, Iran. In this project the overall control logic of two power plants are studied in detail. The objective of this study is to compare the control logic of a newly designed power plant (Shazand) to a relatively older design (Nekka). In this project a extensive simulator for Nekka power plant is designed and identified, and some modern control techniques to revamp the control logic of this power plant is developed.